Skip to Main Content
Rather Phone?

In PEI 5-1-1
Outside PEI 1-855-241-2680

Français
HOME  /  511  /  Text Report

Text Report

Emergency Advisories
1 Borden to Crapaud Bare dry 2015-07-20 13:40
1 Borden to Crapaud construction, heavy equipment working, reduced speed 2015-07-20 to 2015-11-06
Realignment of Route 1 in Tryon is underway. This project commences 1.1 kms east of the Rte 1 and North Tryon Cross Road for a distance of approximately 1.3 kms, including 400 metres of new road that will realign the Tryon Mill and Branch Roads. The majority of work will be off road and two-way traffic will be maintained during construction hours.
(Show More)
2015-07-20 13:40
1 Crapaud to Charlottetown Bare dry 2015-08-28 13:24
1 Crapaud to Charlottetown reduced speed, heavy equipment working, flag persons on site, be prepared to stop, expect delays of under 15 minutes 2015-08-31 to 2015-09-18
Beginning on Monday, August 31, 2015 there will be intermittent lane closures of the Riverside Drive roundabout (Riverside Drive/Garfield Street) to allow for testing and remediation work. Work is expected to take 2-3 weeks. Delays can be expected and signage will be in place.
(Show More)
2015-08-28 13:27
1 Charlottetown to Belfast Bare dry 2015-08-27 16:14
1 Charlottetown to Belfast construction, heavy equipment working, reduced speed, milled surface, flag persons on site, be prepared to stop, expect delays of under 15 minutes 2015-08-19 to 2015-09-09
Construction is underway on Route 1 in Mount Herbert to widen and resurface the road. This project commences 50 metres east of the Mount Herbert Road intersection and proceeds east along Rte 1 for a distance of approximately 550 metres. Two-way, one lane traffic will be maintained. Delays can be expected.
(Show More)
2015-08-24 15:19
1 Charlottetown to Belfast reduced speed, watch for equipment & persons working, be prepared to stop, morning only, expect delays of under 15 minutes 2015-08-30
On Sunday, August 30, 2015, between 7:00 a.m and noon, there will be a full lane closure of the Hillsborough Bridge, along with some intermittent full bridge closures.The full bridge closures will be no longer than 15 minutes at any given time. Signage will be in place.The lane and bridge closures are necessary to conduct load testing on the bridge.
(Show More)
2015-08-27 16:14
1 Belfast to Wood Islands Bare dry 2015-07-17 08:23
1A Summerside to Albany Bare dry 2015-05-04 08:48
2 Tignish to O'Leary Corner Bare dry 2015-05-04 08:48
2 O'Leary Corner to Summerside Bare dry 2015-08-17 08:49
2 O'Leary Corner to Summerside bridge replacement, passable/caution, traffic signals, reduced speed, one lane traffic, flag persons, watch for equipment & persons working, be prepared to stop 2015-07-06 to 2015-09-08
Inverness Bridge Replacement - Rte 2 . A single lane temporary bypass road has been constructed on site and will serve as the 'detour' throughout the entire construction period.Traffic lights (green/red) will be operational affective Thursday July 16.
(Show More)
2015-07-15 15:04
2 O'Leary Corner to Summerside construction, heavy equipment working, flag persons on site, be prepared to stop, expect delays
Road widening in Portage along Route 2 to accommodate a left turn lane onto Route 12. One way traffic will be maintained during construction hours. This project is approximately 1.1 km in length. Delays are to expected.
(Show More)
2015-08-17 08:49
2 Summerside to Summerfield Bare dry 2015-05-04 08:48
2 Summerfield to Charlottetown Bare dry 2015-07-17 08:23
2 Charlottetown to Morell Bare dry 2015-07-17 08:23
2 Charlottetown to Morell construction, heavy equipment working, reduced speed, surface breaks, milled surface, unpaved surface, one lane traffic, fresh asphalt, flag persons on site 2015-07-30 to 2015-08-28
Rte 2 Tracadie - 1.60 km Construction on Route 2 is underway to widen and resurface the roadway. Two-way, one lane traffic will be maintained, minor delays can be expected
2015-07-30 15:54
2 Morell to Souris Bare dry 2015-07-17 08:16
2 Morell to Souris bridge replacement, passable/caution, barricades in place, re-opened, reduced speed, flag persons starting 2014-10-06
Souris Bridge - Route 2. Affective Friday July 17 the Souris Bridge is open to Through traffic. Work continues on the bridge and flag person will be on site. Drive with caution
2015-07-17 08:16
3 Cherry Valley to Georgetown Bare dry 2015-07-17 08:16
4 Montague to Dingwells Mills Bare dry 2015-07-17 08:16
Rte 6 New London to Kensington bridge replacement, barricades in place, traffic signals, surface breaks, one lane traffic, flag persons, be prepared to stop 2015-08-31 to 2015-10-23
Clinton Bridge Structure Replacement Rte 6. A temporary single lane by-pass will be built on site commencing Monday. once the by-pass road is completed traffic will be controlled by traffic lights.
2015-08-28 11:11
Brackley Point Rd - Rte 15 Brackley to Brackley Beach construction, heavy equipment working, flag persons on site, be prepared to stop, expect delays 2015-06-23 to 2015-08-28
Construction is underway on the intersection of Route 15 and Route 220 in Brackley. Two-way, one lane traffic will be maintained. Minor delays can be expected.
2015-08-20 14:20
Baldwins Rd - Rte 22 Mount Stewart to Baldwin Road construction, heavy equipment working, surface breaks, rough, milled surface, unpaved surface, one lane traffic, loose stones, fresh asphalt, flag persons on site, expect delays 2015-07-20 to 2015-08-14
Int Rte 5 48 Road and Rte 22 Baldwins Road Intersection. Contruction will start Monday July 20 to build a roundabout. two way, one lane traffic will be maintained throughout construction which is expected to take 4 weeks. Minor delays are to be expected.
(Show More)
2015-07-18 07:29
Jerry Rd - Rte 148 Roseville to Howlan traffic flow restriction, washout, one lane traffic, barricades in place
Jerry Road is reduced to one lane traffic at the bridge located half way (~ 2km) between the O'Halloran Road - Rte 145 and Duvar Rd - Rte 146 intersections.
2014-12-23 14:22
North York River Rd - Rte 248 Cornwall to Milton Station bridge out, bridge closed, local detour, barricades in place, flag persons 2015-06-29 to 2015-09-04
Traffic will be diverted using the Loyalist Road Rout 256
Milton Bridge Replacement Route 248. Work will commence on Monday June 29th with an expected completion date of Sept 4. Local Detour in affect
2015-06-24 15:23
315 Wood Islands to Caledonia Bare dry 2015-07-17 08:23
315 Caledonia to Montague Bare dry 2015-07-17 08:16